Mubasher TV
Contact Us Advertising   العربية

Egypt builds Aswan High Dam alternative axis at EGP 1.6bn

Egypt builds Aswan High Dam alternative axis at EGP 1.6bn
The axis will be 5.4 kilometres long and 29 metres wide

Cairo – Mubasher: Egypt is expected to complete the alternative axis for Aswan High Dam bridge by the end of 2021, the Minister of Transport, Kamel El-Wazir, revealed.

The axis will connect Baranis-Aswan Road with Cairo-Aswan Western Desert Road, El-Wazir said in a statement on Sunday.

At a length of 5.4 kilometres and a width of 29 metres, the axis is being constructed at a cost of EGP 1.6 billion.